The last couple of weeks I have started thinking about what bits of tidying up need to be done on the boat and trailer a and have been taking a look at the rigging. Firstly I have fitted some new side bunks to the trailer as the old home built ones were rotton and needed replacing. I actually lost part of my side bunk getting the boat home and we had to rig up a bit of wood to replace it! I have also fitted a new winch as the old one was all rusty.
Since the new winch was fitted I was able to lower the boat off the trailer and onto the grass in my back garden.


I am thinking about what I should do while the boat is off the trailer and have been thinking of painting the trailer with some silver hammerite and maybe adding another keel roller in the middle of the back section of the draw bar where there is a gap as the keel was rubbing on the draw bar at that point.
Also the wood work needs a bit of attention I am thinking of sanding back the plywood and applying some sort of marine varnish, or perhaps removing the plywood and replacing it with slatted seating as when I look at pictures of other orkney skuas they seem to have that style of seating and alot less woodwork filling up the hull.


Something like this?

I am just really open to suggestions and advice as am trying to get the boat in order, working out the rigging for what sails and masts I have will be another story








